Introducing IONOMY™ - The Future of Sustainable Coil Coating
IONOMY™ renewable energy curing eliminates thermal ovens, reducing your carbon footprint by 70% and operating costs by €200K+ annually while doubling production speed. Production-ready Q2 2026.
Limited slots available | 8 partners already committed
Major manufacturing partners trust AkzoNobel
Consume 40-60% of total production energy
Massive energy bills that cut deeply into profit margins
Require 15-20 minutes of curing time per coil
Slow production speeds limit output capacity
Generate ~850 tons CO₂ emissions per year
Enormous carbon footprint as regulations tighten
Limited color flexibility due to oven cleaning
Hours of production lost when switching colors
40% energy cost reduction
UV-LED technology slashes energy consumption dramatically
2x faster curing (7-10 minutes)
Double your production capacity without adding lines
70% lower CO₂ emissions per meter coated
Meet sustainability goals while reducing costs
Instant color switching, no oven purging
Maximize flexibility and minimize downtime
€200K-€500K annual savings
Typical ROI for mid-size coil coating operations
From consultation to full production in months, not years
Our technical team evaluates your current setup and calculates exact savings potential. Free consultation with no obligations.
Seamless integration with your existing production line. Comprehensive training for your operators. Typical installation: 2-4 weeks.
Start producing with IONOMY. Ongoing support and optimization to maximize your savings and output. See results from day one.
UV-LED technology eliminates the need for gas-powered thermal ovens, powered entirely by electricity with renewable energy options.
Curing time reduced from 15-20 minutes to just 7-10 minutes, allowing you to produce twice as many coils on the same line.
No oven purging required. Change colors in seconds instead of hours, dramatically increasing scheduling flexibility.
Precise UV control ensures consistent, high-quality finishes with excellent adhesion, durability, and color accuracy.
70% reduction in carbon emissions helps you meet environmental regulations and corporate sustainability commitments.
Typical payback period of 2-3 years with €200K-€500K in annual operational savings for mid-size facilities.
From construction to appliances, our coil coatings deliver durability, aesthetics, and performance
Engineered to withstand the elements, offering lasting protection and aesthetic enhancement for architectural projects.
Explore FIDURA™
High-performance coatings engineered for durability, aesthetics, and functionality in everyday appliances.
Explore FLEXTEC™
Coatings made to protect and maintain appearance of transportation vehicles even in harsh conditions.
Learn More
Coatings for radiators, office furniture, elevators, road signs—enhancing efficiency and reducing maintenance needs.
Learn MoreUse our innovative 3D color visualization tool to preview and select the perfect coil coating for your project. Adjust angles, lighting conditions, and finishes to make confident color choices and bring your creative vision to life.
Get the Coil and Extrusion industry in the Groove with our latest color innovations
Discover COY26 Colors"IONOMY reduced our energy costs by €220,000 annually while completely eliminating downtime from oven maintenance. The installation was seamless, and our operators adapted to the new system within days. We're now producing 40% more coils on the same production line."
Johan Vandermeer
Director of Operations, European Metal Fabricators
IONOMY UV-LED curing delivers equal or superior coating quality compared to thermal ovens. Our technology provides precise UV control, ensuring consistent finishes with excellent adhesion, durability, and color accuracy. Independent testing shows IONOMY coatings meet or exceed all industry standards for corrosion resistance, weatherability, and mechanical properties.
IONOMY systems can be integrated alongside your existing lines or as a complete replacement. Many clients choose a phased approach, starting with one line while maintaining thermal oven backup capacity. Our team helps you develop the optimal transition strategy based on your production requirements and timeline.
From initial assessment to full production, most installations take 3-6 months. This includes: Technical assessment (2-3 weeks), System design and manufacturing (8-12 weeks), Installation (2-4 weeks), and Training and optimization (1-2 weeks). Production-ready systems available starting Q2 2026.
Investment varies based on line capacity and configuration, typically €500K-€2M for a complete system. However, with annual savings of €200K-€500K, most facilities see full ROI in 2-3 years. We provide detailed ROI analysis during the assessment phase, customized to your production volume and energy costs.
Yes. Complete turnkey implementation includes installation, integration with existing systems, comprehensive operator training, and ongoing technical support. Our team remains available for optimization support and troubleshooting. Most operators are fully proficient within 1-2 weeks.
Production-ready systems launch Q2 2026 with limited initial capacity. Early reservation ensures: Priority scheduling for your preferred timeline, dedicated engineering support, potential early-adopter benefits, and competitive advantage by reducing costs ahead of competitors. With only 7 slots remaining, early commitment is recommended.
Join industry leaders who are already committed to IONOMY. Reserve your implementation slot before capacity fills.
No obligation. Free ROI analysis included with reservation.
Get monthly insights on coating technology, sustainability trends, and color innovations. Join our community of industry professionals.